Installation Steps:
1. The oxygen tube passes through the small hole
2. Connect the bubble stone
3. Install transparent acrylic tube (thin)
4. Connect to the main hatching room
5. Install black biochemical cotton
6. Install two fixed valves
7. The other end of the blue control valve is connected to the air pump.